Most of the Tunnels Constructed with Drill & Blast method and NATM (New Austrian Tunneling Method) uses the Wire Mesh in the construction phase, the method of constructing tunnel is same for Road Tunnel, Railway Tunnel or the HRT(Head Race Tunnel) of any HEP, So, the requirement of Wire Mesh is there for all projects of Tunnel Construction.

